backtop


Print 114 comment(s) - last by Indianapolis.. on Apr 14 at 10:20 AM

It expects to build 23 more at over $900,000 a piece

The city of Arlington just recently opened an impressive bus stop with a not-so-impressive price tag of $1 million.
 
The “super stop” in Arlington, Virginia is unlike any other bus stop. It has a custom designed roof made of glass and steel; a wall of etched glass; heaters in the floor; gorgeous landscaping, and concrete/stainless steel benches.
 
The bus stop has 10-inch high curbs, 90 feet of concrete and can shelter 15 people at a time while waiting for buses to arrive – all at a cost of $1 million.
 
The cost comes down to $575,000 for construction/fabrication and $440,000 for construction management and inspections, where federal/state money took care of 80 percent of the total price tag.
 
When Arlington citizens discovered the cost of the super stop, many were outraged.
 
“That’s ridiculous,” said Robin Stewart, a citizen who was waiting at the super stop. “From a citizen, from a voter, whoever put that budget through needs to get their butt canned. It’s an outrage.”
 
The super stop opened on March 11, and 23 more are planned for Arlington’s streetcars. The county has set aside $20.8 million for all of them, which is about $904,000 a piece.
 
The idea behind the fancy bus stops is to not only accommodate Arlington’s plans for its streetcars and buses (about 16,000 people use the Columbia Pike buses for transportation) but to also draw people to the area. New housing is expected to be built in the area over the next two decades, and the county hopes the bus stops will help it flourish.
 
“When you do a prototype, you end up heavily front-loading on the costs,” said Dennis Leach, Arlington’s transportation director. “These are more like high-capacity bus or rail stops.”
 
But citizens are concerned about the budget, saying that Arlington can build nice bus stops without having to spend $1 million.
 
“Oh my God. How much steel? How much cement? How much glass? One million? Bring them to court,” said Husain Hamid, who was waiting at the super stop. “People are hungry. People are sleeping on the street. It doesn’t need $1 million.”

Source: Washington Post



Comments     Threshold


This article is over a month old, voting and posting comments is disabled

A Bloated Contractor for sure!
By Kim P on 4/7/2013 2:41:14 PM , Rating: 2
Ok, I am a general contractor in the state of WI. Most new construction projects have a Management/Inspection fee of around 10-20% depending on complexity. When they say "Management/Inspection" that is literally it - the costs of labor to construct, fabricate parts/engineer the design and so on would all be part of the $550k discussed. Someone got paid almost as much as the materials/labor cost just to supervise the construction. That is ridiculous. Also, someone said that "maybe they had $20mil left in their budget" - you know what...that is not THEIR money to spend willy nilly. It is your money (the state part) and my money (the fed part) GIVE IT BACK!




By blistering_blather on 4/7/2013 8:18:34 PM , Rating: 2
Thank you - as I said elsewhere, the jacked-up management/inspection costs are partially a function of the bloated bureaucratic culture of this place.


"We’re Apple. We don’t wear suits. We don’t even own suits." -- Apple CEO Steve Jobs

Related Articles













botimage
Copyright 2014 DailyTech LLC. - RSS Feed | Advertise | About Us | Ethics | FAQ | Terms, Conditions & Privacy Information | Kristopher Kubicki