backtop


Print 55 comment(s) - last by Yames.. on Apr 26 at 1:49 PM


Scientists ready the X-37B unmanned orbital vehicle. The U.S. Air Force is using the space plane for unknown purposes.  (Source: EPA)

The X-37B sat in a silo earlier today.  (Source: EPA)

As evening set, the super-high tech craft launched in about as stealthy fashion is possible when using an Atlas V rocket.  (Source: EPA)

A rendering shows what the X-37B might look like in orbit.  (Source: EPA)
Is the X-37B the future of space flight? Maybe, but the Air Force sure isn't saying

The X-37B's curious tale began in 1999 when NASA contracted Boeing's Phantom Works (Calif.) division to build an unmanned space airplane.  The project was transferred to the Defense Advanced Research Projects Agency in September, 2004.  The NASA X-37A was redesigned in 2006 by a secret U.S. Air Force research unit, completing the current design, dubbed the X-37B Orbital Test Vehicle (OTV).

The craft was recently completed and has a 4.5 meter wingspan with a length of 8.9 meters.  It comes equipped with kerosene and hydrogen peroxide fuel tanks, an experimental bay, a large navigation "brain", and likely other more secret components.

Thursday night the OTV hurled into space in what appeared to be a clean launch from the Cape Canaveral Air Force Station in Florida.  The X-37B OTV was carried on an Atlas V rocket, a relatively inexpensive rocket that has an extremely reliable track record.

What's it doing in space?  Your guess is as good as anyone else's.  And guesses tend to range from "deploying spy satellites" to "maintaining spy satellites".

Speaking to reporters, Gary Payton, Air Force deputy under secretary for space systems, confessed that there was indeed a secretive launch.  He comments, "Well, you can't hide a space launch, so at some point extra security doesn't do you any good."

The OTV will remain in orbit for nine months and then will make a landing at Vandenberg Air Force Base, Calif.  So is it doing something with spy satellites?  Payton would only guardedly remark, "On this flight the main thing we want to emphasize is the vehicle itself, not really, what's going on in the on-orbit phase because the vehicle itself is the piece of news here."

Payton didn't exact make any bold predictions of success either.  He comments, "In all honesty, we don't know when it's coming back for sure.  It depends on the progress we make with the on-orbit experiments and the on-orbit demonstrations."

The X-37B project is the culmination of undisclosed hundreds millions in defense spending.  Will all that investment be worth it?  Only a select handful of Air Force and government officials will be privy to the knowledge to make that assessment.

If there's one thing that's one clear about the X-37B project, it's that it aims to take a different approach to space exploration and utilization.  And it makes it clear that the U.S. isn't ready to relinquish its domination of space quite yet.


Comments     Threshold


This article is over a month old, voting and posting comments is disabled

RE: Military > NASA
By drycrust3 on 4/23/2010 2:52:03 PM , Rating: 1
quote:
When the control is under true military control, less nonsense and much faster design times. I'm all for collapsing NASA to fall under USAF


I disagree, it comes down to the management philosophy and how much you care about the consequences if something goes wrong. When I worked in a government department (in New Zealand) it was commonly said "this would be done better / differently if this was a private business" because the private company would care about the consequences more than a government department.
If you look at that new multi-role fighter plane, you can see a management philosophy which is "we are right regardless of the consequences", which is just a small step away from a disaster, usually with people loosing their lives, and often with them loosing them in large numbers.
Yes, I realise this is being designed and built by private contractors, but the problem came from the start when the military believed they could build one plane that did everything cheaper than 3 or 4 more or less specialist planes and there weren't any proper checks carried out to ensure it was really feasible. Now they are in the situation where they are spending more and more money and not actually got anything like what they wanted at the start because they didn't think there were consequences.


"I modded down, down, down, and the flames went higher." -- Sven Olsen














botimage
Copyright 2014 DailyTech LLC. - RSS Feed | Advertise | About Us | Ethics | FAQ | Terms, Conditions & Privacy Information | Kristopher Kubicki